9
9
Opening Drill
Compressor Pumps: Opening Drill® 
Code:
6504
Share on Facebook    Share on Twitter    Share on LinkedIn    Email a friend
The Challenge

The customer manufactures petroleum compressor pumps from Cast Iron (220 Bhn). They are using a 40 HP lathe with 50 PSI (3.447 bar) through tool coolant.

The customer needed a more efficient method of running this process, and they asked Allied for a solution.

The Opening Drill® delivered impressive chip formation.

 

Product: Opening Drill
Objective: Improve process
Industry: Oil & gas/petrochemical
Part: Petro compressor pumps
Material: Cast iron
Hole Ø: 3.25" (82.55mm)
Hole Depth: 4.50" (114.3mm)

 
The Solution
The Opening Drill
  • Drill holder: OP4-1S-SS2.0
Measure Competitor Boring Bar Opening Drill
Number of Passes 400 509
Cycle Time 30 parts 30 parts

 
The Advantages
The Opening Drill provided:
  • 86% cycle time decrease
  • Decreased number of passes
  • Excellent chip formation